Edgewater · Under construction
Aria Reserve North
725 NE 24th St, Miami, FL 33137 Get directionsAt a glance
Project quick facts
- Developer
- Melo Group
- Architect
- Arquitectonica
- Total storeys / units
- 62 storeys / 399
- Deposit structure
- 20% total (confirm schedule)
- Estimated completion
- 2026
- Price per sq. ft.
- Request current availability
- Starting price
- Pricing on request
Aria Reserve North Tower is a luxury waterfront condo building located in Edgewater Miami at 725 NE 24th St. It is slated to be delivered in Q2 2026.
Amenities
- Exclusive adult lounge area with an outdoor terrace overlooking the bay
- Private wine cellar room
- Private elevator and foyer
- Private workspaces + business center + conference room
- Water Sports Marina with kayak and paddle board service and storage
- Access to Baywalk along the water
- Restaurant overlooking the bay
- Café with bay views and exterior terraces
- Valet parking services
- Personal concierge and 24-hour front desk attendant
- Package room for deliveries
- Fire pit
- Lounge pool
- Solarium areas
- Whirlpool spa with private solarium deck
- Meditation garden
- Paddle board service with storage and access to a private dock at the bayside
- Poolside Daybeds
- Telescope observatory area
- Dog Park
Residence features
- Panoramic Residences - floors 3 through 50
Spacious open layouts with 10ft ceilings
- Spacious open layouts with 10ft ceilings
- Two high-speed elevators
- Unique flow-through design that gives each residence east-facing waterfront views as well as west-facing sunset views from bedrooms
- Skyview Residences - floors 51 through 56
Spacious open layouts with 11ft ceilings
- Spacious open layouts with 11ft ceilings
- Large terraces overlooking Biscayne Bay that connect to living areas as well as the master suite
- All units feature space for an office, den, studio, or media room
Good to know
Frequently asked questions
What is the deposit schedule?
The working estimate is 20% total (confirm schedule). Request the current developer schedule before reserving.
When is completion expected?
The estimated completion is 2026. Dates should be confirmed with the sales team.
What are parking costs?
Parking availability and pricing vary by project and should be confirmed with the developer.
Are assignment fees published?
Assignment terms and fees are project-specific. Request the current disclosure with the brochure.