Miami Beach · Pre-construction
Palma Miami Beach
600 71st St, Miami Beach, FL 33141 Get directionsAt a glance
Project quick facts
- Developer
- Lefferts
- Architect
- Built Form
- Total storeys / units
- 14 storeys / 126
- Deposit structure
- 20% total (confirm schedule)
- Estimated completion
- 2027
- Price per sq. ft.
- Request current availability
- Starting price
- Pricing on request
Palma Residences Miami Beach is a luxury preconstruction condo development located in Miami beach at 600 71st Street with 124 condo residences.
Amenities
- Double-height lobby with floor-to-ceiling windows
- Reception desk and welcoming entrance experience
- 24-hour secure access to building, amenities, garage, and private residential areas
- Resort-style pool with private daybeds and luxe cabanas
- Outdoor summer kitchen with bar and pool deck event area
- Resident lounge on the pool level with indoor and outdoor seating for private events
- State-of-the-art fitness center equipped with Technogym machines
- Wellness area featuring hot tub and arctic cold-plunge pools
- Advanced smart building technology throughout
- High-speed fiber-optic internet access
- Wi-Fi available in all common areas
- Ground-level curated retail offerings
Residence features
- Modern open-concept layouts designed for beach-luxe living
- Panoramic ocean and bay views in select residences
- Private balconies for outdoor enjoyment
- 9- to 10-foot ceilings enhancing space and light
- Floor-to-ceiling sliding glass doors with impact-resistant glass
- Pre-wired for high-speed internet and Wi-Fi
- Energy-efficient central air conditioning and heating
- Stacked in-unit washer and dryer
- Spacious closets ideal for a beach-chic wardrobe
- Imported European cabinets with premium fittings
- Bosch appliance package (refrigerator, oven, cooktop, microwave, dishwasher)
- Premium stone countertops and backsplashes
- Stainless steel under-mounted sink with elegant faucet and spray handle
- Imported European cabinets with premium hardware
- Stone countertops and backsplashes
- Porcelain sinks with dual elegant faucets (in select residences)
- Custom-finished porcelain floors and walls in wet areas
- Glass shower enclosures
- European-style fixtures and accessories
Good to know
Frequently asked questions
What is the deposit schedule?
The working estimate is 20% total (confirm schedule). Request the current developer schedule before reserving.
When is completion expected?
The estimated completion is 2027. Dates should be confirmed with the sales team.
What are parking costs?
Parking availability and pricing vary by project and should be confirmed with the developer.
Are assignment fees published?
Assignment terms and fees are project-specific. Request the current disclosure with the brochure.