Coral Gables · Pre-construction
The Village at Coral Gables
535 Santander Ave, Coral Gables, FL 33134 Get directionsAt a glance
Project quick facts
- Developer
- MG Developer
- Architect
- De La Guardia Victoria Architects & Urbanists
- Total storeys / units
- 3 storeys / 48
- Deposit structure
- 20% total (confirm schedule)
- Estimated completion
- 2025
- Price per sq. ft.
- Request current availability
- Starting price
- Pricing on request
The Village at Coral Gables is a preconstruction condo development located in Coral Gables at 535 Santander Avenue with 48 luxury condo residences.
Amenities
- Landscaped plazas, garden spaces, walkways, and fountains
- Spacious covered loggias and balconies for outdoor living
- Outdoor areas ready for summer kitchen installation
- Wide bi-fold door systems connecting indoor and outdoor spaces
- Coral stone flooring on terraces and balconies
- Soundproof wall insulation for added privacy
- Elevator access from garage directly to residence
- Smart-ready home infrastructure (TV and telephone pre-wired)
- Energy-efficient zoned air conditioning system
- Instant hot water with recirculating system
- Emergency power backup for common areas
- FOB-secured building access
- Bike parking racks
- Small package storage area
- 1 electrical vehicle (EV) charger per residence
Residence features
- Hurricane-rated bronze-finish windows and French doors
- Wide bi-folding loggia and balcony doors
- Italian kitchen cabinetry with stone countertops and backsplash
- High-end kitchen appliances and under-mount stainless steel sink
- Natural stone floors throughout interior spaces
- 10-foot cove ceilings in primary rooms
- Premium wood front and interior doors (7–8 feet high)
- Master bathrooms with Italian vanities, double sinks, and walk-in showers
- Separate water closet and high-end plumbing fixtures
- Secondary bathrooms with skylight and Italian cabinets
- Laundry room with large washer/dryer and deep sink
- Smart-ready wiring for TV and telephone
- Energy-efficient zoned air-conditioning
- Instant hot water system with recirculation
- Elevator-accessible from garage to unit
- Balconette for study and covered outdoor entertaining areas
Good to know
Frequently asked questions
What is the deposit schedule?
The working estimate is 20% total (confirm schedule). Request the current developer schedule before reserving.
When is completion expected?
The estimated completion is 2025. Dates should be confirmed with the sales team.
What are parking costs?
Parking availability and pricing vary by project and should be confirmed with the developer.
Are assignment fees published?
Assignment terms and fees are project-specific. Request the current disclosure with the brochure.