Coconut Grove · Pre-construction
Ziggurat
3101 Grand Ave Coconut Grove, , FL 33133 Get directionsAt a glance
Project quick facts
- Developer
- Allen Morris Company
- Architect
- Oppenheim Architecture
- Total storeys / units
- 3 storeys / 19
- Deposit structure
- 20% total (confirm schedule)
- Estimated completion
- 2027
- Price per sq. ft.
- Request current availability
- Starting price
- From $6.3M
Ziggurat is a luxury preconstruction condominium development located in Coconut Grove at 3101 Grand Avenue with 19 condo residences.
Amenities
- Exclusive rooftop membership to a Restaurant led by a MICHELIN-star chef
- Expansive rooftop with resort pool, hydrotherapy circuit, chef’s grilling station, private cabanas and lounge chairs
- Open-air paseo offering cuisine helmed by a MICHELIN-star chef, couture ateliers, an artisanal café and international gourmet market
- Access to state-of-the-art wellness concept
- Custom-designed spaces for private events
- Directly across from Kirk Munroe Park, set to undergo a $6.3M renovation
- Luxury hospitality-trained concierge
- 24-hour valet
Residence features
- Ceilings up to 11 feet high
- Private elevators and foyers with double-door entries
- 12-foot-deep terraces with full summer kitchens
- European oak floors and travertine stone throughout residence interiors
- Spacious walk-in closets with selection of custom wood cabinetry and shelving
- Chef’s kitchens featuring custom Italian wood cabinetry, full pantry, chef’s islands, Italian stone countertops
- Wolf and Sub-Zero appliance package, including 60-inch refrigerator, gas ranges, and built-in wine refrigeration
- In-residence laundry rooms with full-size washer and dryer
- En-suite primary bathrooms with deep soaking tubs, dual-function shower heads, private WC, and fixtures by Dornbracht
- Fully integrated smart home technology
Good to know
Frequently asked questions
What is the deposit schedule?
The working estimate is 20% total (confirm schedule). Request the current developer schedule before reserving.
When is completion expected?
The estimated completion is 2027. Dates should be confirmed with the sales team.
What are parking costs?
Parking availability and pricing vary by project and should be confirmed with the developer.
Are assignment fees published?
Assignment terms and fees are project-specific. Request the current disclosure with the brochure.